TruePipe works on commercial new-construction plumbing for builders, contractors, and property owners. Work may include rough-ins, water piping, drainage, fixture installation, equipment connections, and coordination with other trades.
Common work may include:
Early plumbing coordination helps reduce layout conflicts, access issues, and fixture-placement problems before work moves too far ahead on site.
Commercial new construction plumbing is part of TruePipe's commercial work across Georgetown and Halton Hills, Acton, Milton, Oakville, Brampton and Mississauga.
Tell us about the property, location, timing, access details, and the plumbing issue or project. If available, mention whether you have photos, plans, fixture details, or equipment information that may help clarify the next step.
Before the slab is poured, and ideally before the drawings are finalized. Underground drainage, the water service entry, floor drains and the interceptor and pit locations all go in before the slab, and changing them afterwards means cutting concrete. A review at the drawing stage also catches fixture-placement conflicts with structure and millwork while they are still cheap to move.
The base building already has its water service, main drains and often a few stub-outs, so the work is about tying the new layout into what exists: finding the stubs, confirming the drain sizes and routes, adding the fixtures the tenant needs and sorting out the venting. The condition and capacity of the existing services matter as much as the new work.
Through the general contractor's schedule. Plumbing rough-in goes in after framing and before electrical and drywall close the walls, and fixtures and equipment are connected after tile, millwork and counters are in. TruePipe works to that sequence and flags anything in the layout that affects it early.